论文详情
玛湖油田玛18井区“工厂化”水平井钻井技术
石油钻探技术
2019年 47卷 第2期
阅读:152
查看详情
Title
Factorization Drilling Technology of the Horizontal Well in the Ma18 Well Block of the Mahu Oilfield
Authors
QIN Wenzheng
DANG Jun
ZANG Chuanzhen
LI Baolun
LEI Ming
单位
中国石油集团西部钻探工程有限公司准东钻井公司,新疆克拉玛依 834000
中国石油集团油田技术服务有限公司,北京 100027
Organization
Zhundong Drilling Company, CNPC Xibu Drilling Engineering Company, Karamay, Xingjiang, 834000, China
CNPC Oilfield Technical Service Limited Company, Beijing, 100027, China
摘要
玛湖油田玛18井区致密油气水平井钻井存在钻井速度低、钻井周期长的问题,为此,在分析该井区地层情况和钻井技术难点的基础上,进行了“工厂化”水平井钻井关键技术研究,包括成熟钻头序列优选、直井段采用“MWD+螺杆+PDC钻头”钻进、造斜段和水平段使用“旋转导向工具+PDC钻头”钻进、应用XZ高性能水基钻井液等,形成了玛18井区“工厂化”水平井钻井技术,多口井的现场应用结果表明,单井完井周期明显缩短。其中,MaHW6234和MaHW6235平台水平井单井完井周期缩短至86.0 d;MaHW6203井钻井周期缩短至78.8 d,完钻井深6 130.00 m,创玛湖油田水平井最深纪录。玛湖油田玛18井区“工厂化”水平井钻井技术为高效开发玛湖油田三叠系百口泉组致密油气藏提供了技术支持。
Abstract
In order to improve penetration rate of the Ma18 Well Block in the Mahu Oilfield, the factory drilling plan of horizontal well was proposed based on the analysis of the geological stratum conditions and technical challenges in well drilling in the field. Different techniques were applied to create the factory drilling plan for the horizontal well in the Ma18 Well Block including mature drill bit sequence optimization, the use of MWD + screw+ PDC bit in drilling through vertical sections, the application of rotary steering tool+ PDC bit in the build-up/horizontal sections, and the XZ high-performance water-based drilling fluid, etc. The application of this technology achieved good results. The average single well completion period was significantly reduced resulting in 86.0 d for platform MaHW6234 and MaHW6235. It was reduced to 78.8 d for Well MaHW6203 with total depth to 6 130.00 m, setting the depth record of horizontal wells in the Mahu Oilfield. The factory drilling technology of horizontal wells in the Ma18 Well Block of the Mahu Oilfield has provided technical support for the efficient development of the Triassic Baikouquan Formation reservoir.
关键词:
水平井;
工厂化;
钻井速度;
钻头;
钻井液;
玛湖油田;
Keywords:
horizontal well;
factorization;
drilling speed;
bit;
drilling fluid;
Mahu Oilfield;
基金项目
中国石油天然气股份有限公司科学研究与技术开发项目“新疆和吐哈油田勘探开发关键技术研究与应用”(编号:2017E-04-13)、“重大工程关键技术装备研究与应用(二期)”(编号:2018E-2108)联合资助
DOI
https://doi.org/10.11911/syztjs.2019025