论文详情
井身结构变化及尾管回接对井控的影响分析
石油钻探技术
2013年 41卷 第6期
阅读:144
查看详情
Title
Effects of Casing Program Change and Liner Tieback on Well Control
Authors
Sun Lianwei
Guan Zhichuan
Liang Haiming
Jiang Mengna
单位
中国石油大学(华东)石油工程学院, 山东青岛 266580;
中海油研究总院, 北京 100027;
中石化胜利石油工程有限公司钻井工艺研究院, 山东东营 257017
Organization
School of Petroleum Engineering, China University of Petroleum(Huadong), Qingdao, Shandong, 266580, China;
CNOOC Research Institute, Beijing, 100027, China;
Drilling Technology Research Institute, Sinopec Shengli Oilfield Service Corporation, Dongying, Shandong, 257017, China
摘要
在深井井身结构设计中,为了解决悬挂尾管后继续钻进是否需要进行尾管回接的问题,建立了钻遇高压气层发生气侵时的环空气液流动模型,模拟了井筒横向尺寸变化对环空气液两相流动规律的影响,分析了不同尾管悬挂深度下气侵过程中的井底压力、钻井液增量、监测到一定钻井液增量所需时间的变化规律,以及压井过程中套压峰值和套压峰值到达时间的变化规律。结果表明:尾管回接改变井身结构后,随着尾管悬挂深度的减小,井底压力和钻井液增量剧烈变化阶段先提前后延迟;尾管回接到井口后,溢流发现时间比尾管不回接时要短,有利于溢流的早期发现;在相同溢流量条件下关井,尾管回接到井口后的压井套压峰值比尾管不回接时大;套压峰值到达时间变化不显著。
Abstract
In the casing program design for deep wells,whether liner should be tied back is not clear when drilling continues after cementation.A computing model was established to calculate the wellbore annulus pressure when gas invasion occurs in high pressure gas reservoirs,and the impact of casing size on the annulus two-phase flow.From the point of well control,the bottom hole pressure,mud volume increment,and time needed to detect drilling fluid increment,peak of casing pressure and time to reach the peak pressure were analyzed during gas kick and well killing process.The results showed that:as the liner hanger depth decreased the dramatic change stage of bottom hole pressure and mud volume increment advanced first and then delayed;the discovery time of gas kick after liner was tied back to the wellhead was shorter than when the liner was not tied back;the casing pressure peak was higher when the liner was tied back to wellhead than when the liner was not tied back;but the change in peak casing pressure arrival time was not obvious.Therefore, tie-back liner was conducive to the early detection of gas kick under the condition of safe killing.
关键词:
井身结构;
尾管回接;
环空气液流动;
井控;
压井;
Keywords:
casing program;
liner tieback;
gas and liquid flow in annulus;
well control;
well killing;
基金项目
国家重点基础研究发展计划(“973”计划)项目“深井复杂地层钻井设计平台与风险控制机制”(编号:2010CB226706)、“十二五”国家科技重大专项“西部山前复杂地层安全快速钻完井技术”(编号:2011ZX05021-001)和教育部“海洋油气井钻完井理论与工程”创新团队资助项目资助。
DOI
https://doi.org/10.3969/j.issn.1001-0890.2013.06.007