论文详情
渤海稠油热采隔热管优选和注氮工艺优化
海洋石油
2020年 40卷 第4期
阅读:137
查看详情
Title
Optimization of Heat-insulating Pipes for Thermal Recovery of Heavy Oil in Bohai Sea and Optimization of Nitrogen Injection Technology
Authors
ZHANG Wei
LIU Zhilong
WAN Fen
XIN Ye
YU Xiaotao
Wu Ting
单位
中海石油(中国)有限公司天津分公司,天津 300452
中海石油能源发展股份有限公司工程技术分公司,天津 300452
Organization
CNOOC (China) Co., Ltd. Tianjin Branch, Tianjin 300452, China
CNOOC EnerTech-Drilling & Production Co. Tianjin 300452, China
摘要
渤海油田热采井已进行多轮次蒸汽吞吐,优化井筒隔热技术已成为热采井注汽中关键的技术之一。目前渤海油田L油田A23井已进行了三轮次的蒸汽吞吐现场作业,其中第三轮次注汽管柱在第二轮次注汽基础上进行了优化改进,采用了4-1/2″气凝胶隔热油管注汽工艺,较A23井二轮次使用的高真空隔热油管,有效降低隔热油管每千米的热损失由14.24%降为10.21%;同时采用了环空井筒间歇注氮工艺,降低井筒环空热损,较上一轮次有效地降低了11.86%的总注氮量。通过使用气凝胶隔热油管及环空间歇注氮工艺,降低了注汽井筒热损失,有效地节约了海上热采井注汽成本。
Abstract
The thermal recovery wells in Bohai Oilfield have been subjected to multiple rounds of thermal recovery, and optimizing wellbore insulation technology has become one of the most critical technologies in thermal recovery steam injection. At present, the A23 well in the L oilfield of Bohai Oilfield has carried out three rounds of steam stimulation on-site operation, and the third round of steam injection has been optimized and improved on the basis of the second round of steam injection, using 4-1/2″ aerogel insulated tubing steam injection. Comparing with high vacuum insulated tubing used in the second round of Well A23, the second steam injection effectively reduces the heat loss per kilometer of insulated tubing from 14.24% to 10.21%. Meanwhile, the intermittent nitrogen injection process in the empty wellbore reduces the heat loss in the wellbore annulus and effectively reduces the total nitrogen injection volume by 11.86% compared with the previous round. By using aerogel insulated tubing and annulus intermittent nitrogen injection technology, the heat loss of steam injection is reduced and the cost of steam injection for offshore thermal recovery wells is effectively saved.
关键词:
稠油油藏;
隔热油管;
井筒热损失;
隔热接箍;
环空注氮;
Keywords:
heavy oil reservoir;
insulated tubing;
wellbore heat loss;
insulated coupling;
annulus nitrogen injection;
基金项目
(1)中国海洋石油总公司重大项目-渤海油田3000万吨持续稳产关键技术研究-课题4:稠油规模化热采有效开发技术,项目编号:CNOOC-KJ 135 ZDXM36 TJ04 TJ;(2)国家重大科技专项(2016ZX05058-003-005)
DOI
https://doi.org/10.3969/j.issn.1008-2336.2020.04.025