东海西湖凹陷异常压力机理及钻后检测方法研究

2016年 36卷 第1期
阅读:149
查看详情
Study on the Mechanism of Abnormal Pressure and Pressure Detection Method after Drilling for Xihu Depression in the East China Sea
段飞飞 张海山 邱康 王孝山 王宏民
DUAN Feifei ZHANG Haishan QIU Kang WANG Xiaoshan WANG Hongmin
中海石油(中国)有限公司上海分公司, 上海 200030; 中石化海洋石油工程有限公司, 上海 200120
Shanghai Branch of CNOOC China Limited, Shanghai 200030, China; SINOPEC Offshore Petroleum Engineering Corporation Limited, Shanghai 200120, China
针对东海西湖深部地层压力解释精度低的问题,从东海西湖凹陷构造形成历史入手,研究了东海西湖异常压力机理,优选了西湖凹陷地层压力钻后检测方法。结果表明,钻后检测方法精度较高,满足了钻后评价要求。
The interpretation accuracy on the formation pressure in the deep layers of Xihu Depression is low in the East China Sea. In order to solve this problem, beginning from tectonic evolution history, study about the mechanism of abnormal pressure has been conducted, and detection method of pressure after drilling has been optimized. The study results indicated that the optimized method of pressure is high in accuracy, and can meet the requirements for post drilling evaluation.
西湖凹陷; 压力分布; 异常压力机理; 钻后检测;
Xihu Depression; pressure distribution; mechanism of abnormal pressure; post drilling detection;
https://doi.org/10.3969/j.issn.1008-2336.2016.01.042