埕岛油田中低含水期提注开发试验

2006年 26卷 第3期
阅读:117
查看详情
Water injection rate increase development test of Chengdao Oilfield in low-to-moderate cut stage
齐陆宁 邓艳霞
Qi Luning Deng Yanxia
胜利油田有限公司海洋石油开发公司, 山东东营 257237
Offshore Petroleum Development Company, Shengli Oilfield Ltd.Co., Dongying 257237, China
埕岛油田是河流相疏松砂岩油藏,初期采用温和注水政策,压力降低、液量下降等开发矛盾逐步暴露。为实现海上油田的高速高效开发,通过油藏数值模拟计算和分析,提高注采比可有效提高水驱效果,提高采油速度,实现高速高效开发。2005年7月井区开始提注,提注后对应受效油井出现明显增油效果,液量不断上升,开发形势明显好转。
Chengdao Oilfield is a fluvial face unconsolidated sand reservoir, and sand pressure dropdown, mass production depression and some other development contradictions reveals gradually because of the rate, and develop the reservoir effectively. After increasing water injection rate in pra the production of offset producer improves, the mass production improves step development status improves apparently. ctice in July, 2005, by step, and the
开发矛盾; 数模模拟; 提注; 增油;
development contradiction; reservoir simulation; water injection rate increase; increase production;