塔河油田供水首站恒压供水系统技术改造
石油实验地质
2013年 35卷 第S1期
阅读:128
查看详情
Title
Technical transformation of first station constant pressure water supply system in Tahe Oil Field
Authors
Wang Hongshi
Zhang Bin
Luo Zeng
单位
中国石油化工股份有限公司 西北油田分公司 特种工程管理中心,新疆 轮台841600
Organization
Construction Project Management Center, SINOPEC Northwest Oilfield Company, Luntai Xinjiang, 841600, China
摘要
针对塔河油田淡水需求量的不断增加和首站供水系统现状,对塔河油田供水首站恒压供水系统进行技术改造,即对供电电路和控制线路进行改造,改造后实现系统内2台变频器都能分别带动2台供水泵,供水首站的供水保障能力提高了,满足塔河油田生产、生活用水需求。
Abstract
In view of the increasing demand for fresh water and the present condition of first station water supply system in the Tahe Oil Field, technical innovation has been made, including the transformation of power supply and control circuits. After the transformation, 2 sets of frequency converter can drive 2 pumps respectively, enhancing the water supply capacity of first station and meeting the production and living water demands in the Tahe Oil Field.
Keywords:
frequency converter;
constant pressure water supply system;
Tahe Oil Field;
DOI
https://doi.org/10.11781/sysydz2013S1114