Comparative study of well soaking timing (pre vs. post flowback) for water blockage removal from matrix-fracture interface

2020年 6卷 第3期
阅读:156
查看详情
Nur Wijaya James J. Sheng
Water blockage after hydraulic fracturing is one of the major challenges in shale oil recovery which affects the optimal production from the reservoir. The water blockage represents a higher water saturation near the matrix-fracture interface, which decreases the hydrocarbon relative permeability. The removal of water blockage in the field is typically carried out by soaking the well (i.e., shut-in) after hydraulic fracturing operation is finished. This soaking period allows water redistribution, which decreases the water saturation near the matrix-fracture interface. However, previous field reports show that there is not a strong consensus on whether shut-in is beneficial in terms of production rate or ultimate oil recovery. Due to the large number of parameters involved in hydraulic fracturing and tight formations, it is challenging to select which parameter plays the dominant role in determining the shut-in performance. Furthermore, literature on field case studies does not frequently report the parameters which are of researchers’ interest. In other words, the challenge of evaluating shut-in performance not only lies on the complexity of parameters and effects involved within the reservoir, but also the limited number of field case studies which report a comprehensive list of fracturing and reservoir parameters.
Water blockage; Formation damage; Flowback; Shut-in; Desiccation;
https://doi.org/10.1016/j.petlm.2019.11.001