论文详情
页岩气水平井固井碰压关井阀的研制及应用
断块油气田
2014年 21卷 第06期
阅读:148
查看详情
Title
Development and application of cementing bumping shut?鄄in valve
for shale gas horizontal well
单位
陕西延长石油(集团)有限责任公司研究院,陕西 西安 710075
中国石化中原石油工程有限公司固井公司,河南 濮阳 457001
Organization
Research Institute of Yanchang Petroleum (Group) Co. Ltd., Xi′an 710075, China
Cementing Company, Zhongyuan Petroleum Engineering Co. Ltd., SINOPEC, Puyang 457001, China)
Abstract
Aimed at the low reliability of float collar and float shoe in cementing of shale gas horizontal well and difficulties of grinding cement plug, a new cementing bumping shut-in valve has been developed. The structure and working principle of the tool are introduced in this paper. In order to shut in the well, cementing plug and bump pressure are used as driving part and driving force. Then, the sliding sleeve is moved and the flow passage of bottom hole is permanently closed. The laboratory test and field application show that the shut-n pressure is 14 MPa and can be adjusted by the pin diameter. The forward and reverse of tool can withstand the pressure of more than 25 MPa. The tool has the advantages of simple operation, easy installation and high reliability. It can be used in conjunction with floating hoop shoe and can effectively increase the shut-in success rate of horizontal well after cementing operation. It also can reduce the risk of grinding cement plug and prevent horizontal section from channeling and micro annulus causing due to the backflow of slurry, which has a positive meaning for improving the cementing quality of shale gas horizontal well.