This article introduces Nanshanwan Putaohua reservoirs
past deplaymental practice. The Study of optimum
deplopment has been carried out for Nanshanwan low
permeability lithological reservoirs through analyzing
reservoir characteristics , combing data of well testing and
production testing and production test , comparing with
development pratices of other low permeability sandstone
reservoirs in China ,and using scientific technical methods by
comprehensive evaluation of geological methods. During this
study ,reservoir parameters about development layers ,modes ,
well pattern ,spacing ,and injection2production system all have
been optimally designed and analyed , and reasonable
suggestions about its development in the fulture have deen
given also.