Due to the long bare hole in the second drilling section for
horizontal well in Tahe oilfield ,the cementing of technical casing
has adopted two-stage method. In order to conserve the reservoir
and improve the recovery in the third drilling section , the
combined completion technique was used with liner and screen
pipes. Because of the complicated structure of downhole casing
strings , the centralizer position and hook load and friction have
been calculaed with the software of computer , the other
corresponding measures were also made to guarantee the
downhole safety.At the same time ,the slurry system and additives
as well as the rheological property were optimized to improve the
replacing efficiency.By using the advanced technology in the well
TK112H , the cementing operation was smoothly and got the
excellent efficiency ,the crude oil output was about 100 tons per
day that was tested with the original drilling rig.