Wenzhong oilfield had a development history over 20 years.
It faces production decrease. The traditional method can not meet
the need of development. Quatitative reseach on residual oil is
necessary in this phase ,and well density is high enough to use
numerical simulation. Years of production data also provide
physical foundation it. Therefore , analyze and assess the
production performance of wenzhong oilfield on the bases of
accurate reservoir characterization and quatified geological
model. Moreover , we correct the geology model according to
production ,data from new well ,injection profile ,pressure testing
point out empirically and even quatitatively in some degree the
distribution of residual oil. reservoir numeric simulation pays an
vital role in forecast of residual oil.We can predict the production
performance of oilfield in advance ,and make development plan to
recovery residual oil.