Through study of determination method for intermittent low
producing well , the calculating formula for its open/ close time
and production output has been achieved ,which focusing on low
producing, low permeability and low porosity of the formation
produced intermittently , and the pressure build-up theory and
well-bore flow pressure distribution theory applied. The field
operation proves that not only it can increase the productivity per
well and/ or zone , but also increase the efficiency of pump ,
maximize saving the electrical power ,and also obtain the direct
observable economic benefits through the optimizing the
intermittent production method system.