Contraposing the peculiarities of extrude inconsistency in
interbedded and plane at adjection2water exploitation Wen51-
Block in Pucheng oil field , and the lowness of water drive
degrees ,exploiture effect of oil is not good. The fine description
for oil reservoir ,make clear conformation and left oil distributing ,
againest general adjusting for well2net , perfected well-net ,
achieved many sandstone oil exploitation object displaced at
containing more water time ,and advanced water drive degrees in
the second layer or the third one , reduced integrated water
contains ,the annual yield has increased ,the exploitation impact
has gained evidence improvement. This method have supervise for
the same oil reserveoir well2netadjusting.