论文详情
大港油田高含水油藏聚合物驱开发技术
石油钻采工艺
2015年 37卷 第3期
阅读:77
查看详情
Title
Technology for development of high watercut oil reservoir by polymer flooding in Dagang Oilfield
作者
陈一鹤
叶继根
周莹
朱红云
刘天宇
宋舜尧
Authors
CHEN Yihe
YE Jigen
ZHOU Ying
ZHU Hongyun
LIU Tianyu
SONG Shunyao
单位
中国石油勘探开发研究院,北京 100083
中国石油大学北京,北京 102249
大港油田公司勘探开发研究院,天津 300280
Organization
Research Institute of Petroleum Exploration and Development, CNPC, Beijing 100083, China
China University of Petroleum, Beijing 102249, China
Research Institute of Petroleum Exploration and Development of CNPC Dagang Oilfield Company, Tianjin 300280, China
摘要
针对港西二区在二次开发过程中,含水率上升速度快、油藏采收率较低的问题,对港西二区进行了整装区块的聚合物驱实验研究。通过对该区块进行适应性评价及数值模拟研究,确定了注聚井及注聚层位,制订了相应的注聚方案。经过注聚后的跟踪研究发现,聚合物驱改善了港西二区的开发效果,并根据开发效果,对注聚方案进行了重新优化,重新认识了黏度、段塞与驱油效率的关系,利用油藏数值模拟对聚合物驱开发效果进行了预测。港西二区注聚合物驱技术的成功实施为高含水油藏整装区块的聚合物驱开发提供了良好范例。
Abstract
In view of the problems of fast increase in watercut and low recovery rate of oil reservoirs at the end phase of secondary development of No.2 Gangxi Region, experimental research has been conducted on polymer flooding for the whole block of No.2 Gangxi Region. Through adaptability evaluation on this block and research on numerical simulation, the polymer injection well and injection zones were determined, and the polymer injection scheme was formulated for No.2 Gangxi Region. Through follow-up after polymer injection, it was found that polymer flooding has improved the development effectiveness of No.2 Gangxi Region. Based on the development efficiency, the polymer injection scheme was re-optimized, and the relation between viscosity, slug and oil flooding efficiency was again recognized. The numerical polymer flooding model for oil reservoirs was used to predict the development effectiveness of polymer flooding. The No.2 Gangxi Region has provided a favorable example for the development of the whole block of high watercut oil reservoir by polymer flooding.
关键词:
聚合物驱;
采收率;
三次采油;
数值模拟;
Keywords:
polymer flooding;
recovery rate;
tertiary oil recovery;
numerical simulation;
DOI
10.13639/j.odpt.2015.03.022