论文详情
煤层气直井排采捞煤粉一体化技术
石油钻采工艺
2014年 36卷 第5期
阅读:91
查看详情
Title
Technology of integrating drainage, gas production and coaldust bailing for coalbed methane vertical wells
Authors
DUAN Baoyu
CUI Jinbang
DUAN Ran
CHEN Jie
ZHENG Qinlong
LI Jinguang
单位
华北油田公司采油工程研究院,河北任丘 062552
华北油田公司煤层气勘探开发事业部,山西长治 046000
华北油田公司储气库,河北廊坊 065000
华北油田公司采油四厂,河北廊坊 065000
Organization
Petroleum Production Engineering Research Institute of Huabei Oilfield Company, Renqiu 062552, China
Coalbed Methane Exploration and Development Division of Huabei Oilfield Company, CNPC, Changzhi 046000, China
Gas Storage of Huabei Oilfield Company, CNPC, Langfang 065000, China
No. 4 Oil Production Plant of Huabei Oilfield Company, CNPC, Langfang 065000, China
摘要
在煤层气井开采过程中,目前用的最多的还是抽油机排采系统,在排采泵方面主要采用常规整筒泵,这种泵所存在的主要问题是煤粉卡泵和煤粉卡固定阀、游动阀,导致系统频繁作业,严重影响了煤层气的开采时率。为了有效解决这个问题, 研制出一套排采捞煤粉一体化管柱,该管柱采用新型防煤粉泵和挂篮式沉砂管,使煤层气井的排采、捞砂一体化成为可能。新型防煤粉泵采用了高支固定阀和大直径游动阀的长柱塞结构,不仅可以有效防止煤粉卡固定阀、游动阀,还能有效防止煤粉进入泵筒造成卡泵;排采过程中沉积下来的煤粉进入挂篮式沉砂管中,待到检泵时连同沉积在沉砂管中的煤粉一同起出,取消了捞煤粉环节,节约成本。现场应用表明,煤层气直井排采捞煤粉一体化管柱适应现场需求,延长了检泵周期,具有良好的推广前景。
Abstract
During extraction of coalbed methane well, the most used method is pumping unit discharge and extraction system. The conventional mono-barrel pump is usually used as the discharge and extraction pump; the main problem of this pump is that pump is stuck by coal dust with standing valve and traveling valve are also stuck by coal dust, leading to frequent operation of the system and severely affecting the production efficiency of coalbed methane. In order to effectively solve this problem, a set of string integrating discharge, extraction and bailing of coal dust has been developed, which uses new coal dust-proof pump and basket settling pipe, making it possible to integrate discharge, extraction and sand bailing in coalbed methane wells. The new coaldust-proof pump utilizes long plunger structure with highly standing valve and large-diameter travelling valve, which cannot only effectively prevent coaldust from sticking the standing valve and travelling valve, but also effectively prevent coaldust from entering pump barrel and causing stuck pump. The coaldust deposited during discharge and extraction goes into the basket sand setting pipe, which will be removed together with coaldust deposited in the sand setting pipe during pump inspection, diminishing the work of bailing coaldust and saving the cost. Field application shows that the pipe string integrating coalbed methane discharge, extraction and coaldust bailing by vertical well can meet the site requirement, extend the pump inspection cycle and has good promotion prospect.
关键词:
煤层气;
直井;
排水采气;
捞砂;
一体化;
Keywords:
coalbed methane;
vertical well;
drainage and gas production;
sand bailing;
integration;