论文详情
大庆葡南油田三、五断块调整井固井技术
石油钻采工艺
2011年 33卷 第2期
阅读:102
查看详情
Title
Cementing technology for adjustment wells of Punan 3/5 blocks in Daqing Oilfield
Authors
YANG Chunhe
ZhANG Chunming
JIN Xianzhong
单位
大庆钻探工程公司钻井一公司,黑龙江大庆 163411
Organization
No.1 Drilling Company of Daqing Drilling and Exploration Engineering Corporation, Daqing 163411, China
摘要
葡南油田三、五断块地质条件复杂,钻井和完井过程中多次发生井漏、井涌、下套管后管外冒和井喷等复杂事故,固井质量不易保证,完井工作难度较大。在分析影响固井质量因素的基础上,结合具体施工情况,制定了相应的固井对策。低压易漏区以防漏为主,分别采用了免钻双级固井、防漏堵漏水泥浆固井、双凝水泥浆固井技术;低渗高压区以防窜为主,采用了防窜固井技术。2010年在葡南油田三、五断块进行了45口井的现场施工,固井施工一次成功,固井质量全部合格,优质率达到了75%,形成了一套指导该地区固井的配套技术。
Abstract
Punan 3/5 blocks are located in south- Putaohua Structure, extending to the south, in the second-level of structural elements of Daqing Placanticline. The reservoirs are still dominated by structure. The depth of reservoir is from 950m to 1000m. Because of complex geological conditions, circulation loss, well kick, borehole collapse and oil/gas emits outside casing after cementing easily happened during the drilling process and completion. The cementing quality could not be ensured. By the analysis of the influence factors on cementing quality, and according to completion technique, cement slurry system and cementing methods, the corresponding solutions are planned. Nondrilling-two–stage cementing, circulation loss control cement slurry and bi-setting cement slurry were used for circulation loss in weak formations. Anti-channeling Cementing operations were used in low permeability and high pressure reservoirs. In 2010, cementing jobs on 45 wells were all conducted successfully in Punan 3/5 blocks, and the excellent ratio was 75%, which indicated a matching cementing technology is formed for this area.
关键词:
葡南油田三、五断块;
调整井;
复杂区块;
固井;
对策;
Keywords:
Punan 3/5 blocks;
adjustment wells;
complex block;
cementing;
corresponding solutions;