陕甘宁盆地中部气田井身结构的优化选择

1995年 17卷 第4期
阅读:89
查看详情
THE OPTIMIZATION OF GAS WELL CASING PROGRAM IN CENTRAL AREAS OF SHANGANNING BASIN
史兴全
Shi Xingquang
长庆石油勘探局
陕甘宁盆地在勘探过程中,逐步优化井身结构,形成现在的?273mm表层套管下深500m,封住上部的水层、易斜层和漏层,然后下?177.8mm油层套管后期完成。本文论证了选择井身结构的重要性和可行性,介绍了长庆油田经过几年技术攻关,解决了在3000m的多层系、多压力系统的长裸眼井段内,安全、快速又能保护产层的钻井、完井技术。作者认为,优化后的井身结构,不仅是当前经济、有效地开发陕甘宁中部气田的最佳选择,而且也为后期套管腐蚀的修复和回采接替资源层留有余地。
During the exploration of the Shanganning basin, the casing program was gradualy optimized,which at present is performed with the ?273mm surface casings running to 500m, shutting off the over laying water zone, inclining zone and leakage zone, and the ?177. 8mm production casing run for the final completion. This paper domenstrated the importance and feasility of selecting casing program, recommended the well drilling and completion technologies by Changqing oil field over a few year of efforts,which made it possible to drill safely and rapidly in the long open sections located in multi-layered and multi-pressured formations,while these techologies could prevent the formation from being damaged. It is believed that the optimized casing program is not only the best way to develop the gas field in central Shanganning basin economically and efficiently,but also made it possible for the repairing of corroded casings the recovery of replacement formation.
鄂尔多斯盆地; 气田; 井身结构; 最优化; 钻井液; 固井; 防止地层损害;
E’erduosi gas field; casing program; optimization; drilling fluid well cemeting; formation damage prevention;
10.3969/j.issn.1000-7393.1995.04.003